On the premises there is:
The railway arrow divides the entrance into three railway dead ends where raw materials are unloaded.
The capacity of two dead ends of the first stage is 14 cars each.
The capacity of the railway dead end No. 3 on the second stage is 30 cars.
The total capacity of railway dead ends is 58 cars.
It is possible to unload and load cars horizontally, vertically, and at the rear.
The territory of the enterprise is fenced with a chain-link fence and a metal profiled sheet.
A security alarm system and video surveillance system are installed around the perimeter.